Product development · Shenzhen

From a sketch or a sample to goods on a pallet

Most buyers don't need a supplier — they need a product that exists, built by a factory that can repeat it. I run that process: sampling, tooling, DFM feedback, mass production and inspection.

$300–800fixed fee for sampling & development
3–5%follow-through fee on production
7 stepsfrom brief to shipment

Process

Seven steps, and exactly what I do in each

  1. Brief and feasibility

    I tell you which categories are realistically doable at your target price and volume, before you spend anything. Sometimes the honest answer is that your target price doesn't match your spec.

  2. Supplier selection

    3–5 factories with the right tooling and certifications, filtered on past projects rather than on how impressive the showroom is.

  3. Quotation and cost breakdown

    One page per factory: unit price at your volume, tooling, packaging, certification, lead time. You see the margin on both sides.

  4. Sampling (1st, 2nd, 3rd round)

    Each round produces a change list. I photograph and measure against your spec so feedback is objective, not "it feels a bit off".

  5. DFM and pre-production meeting

    Tooling review, assembly instructions, packing method and a final pre-production sample that everyone signs off on.

  6. Mass production

    Weekly photo updates, plus a mid-line inspection roughly 30% through production so problems surface early rather than at the container.

  7. Final inspection and shipping

    Full pre-shipment inspection against the approved sample, then consolidation and freight quotes.

Fee structure

Fixed project fee, then a follow-through fee

Sampling & development

$300–800 fixed project fee covering supplier search, sample rounds and DFM work. Depends on category complexity, not on order value.

Production follow-through

3–5% charged once mass production is approved, on the order value. Covers production follow-up and final inspection.

Tooling & certification

At cost — passed through at actual cost with the invoice attached. No markup on tooling, ever.

Full pricing detail, including what is not included

Start a project

Tell me what you want to build

A photo, a competitor's product, a sketch, or a half-formed idea — all of these are enough to start. I'll come back with feasibility and a cost range.

  • Feasibility answer before you commit to tooling
  • Development fee agreed and fixed before sampling starts
  • You own the tooling and the designs, in writing

No newsletter, no reselling of your details. Reply within 24 hours. · buyewe@buyewe.com

Email